What sort of checks should I run after a successful installation?¶
After a successful installation of wire-server and its components, there are some useful checks to be run to ensure the proper functioning of the system. Here’s a non-exhaustive list of checks to run on the hosts:
Ensure that NTP has been properly set up (NTP Checks)
Same for log rotation (Logs and Data Protection checks)
NOTE: This page is a work in progress, more sections to be added soon.